Northland Road 3

Heron Bros
Client

Heron Bros Ltd


Heron Bros
Location

Derry/Londonderry, N. Ireland


Heron Bros
Duration

21 Months


Heron Bros
Completion

June 2021


Heron Bros
Value

£9M


Heron Bros
Client

Heron Bros Ltd


Heron Bros
Location

Derry/Londonderry, N. Ireland


Heron Bros
Duration

21 Months


Heron Bros
Completion

June 2021


Heron Bros
Value

£9M


Heron Bros’ Northland Road 3 project marked a significant milestone as the first building on the island of Ireland to incorporate Dekton, an innovative, ultracompact material into its rainscreen façade. This £9 million Grade A office development in Derry/Londonderry showcased innovation at every stage, from construction techniques to supply chain collaboration.

Central to the project’s success was the partnership with Kingspan Fabrik to develop the first off-site integral granite faced Glass Reinforced Concrete (GRC) wall and window panel system. This pioneering solution enhanced design quality, durability, and cost efficiency while significantly reducing build times. As the third phase of a £25 million Design & Build Office Development Framework, the project benefited from collaborative working and cutting edge design that delivered bespoke solutions tailored to client needs.

Heron Bros applied best practice principles and lessons learned from previous phases of the framework, including stakeholder feedback, to elevate both the quality of accommodation and the efficiency of delivery. These insights helped optimise construction periods and raise the overall standard of the build.

The construction itself comprised a five storey, 6,000m² office building supported by piled foundations and a robust structural steel frame. Composite concrete flooring and perimeter strip curtain walling allowed for exemplary daylight levels, reducing energy demands throughout the building. The innovative use of Dekton in the rainscreen façade and the granite faced GRC panels reduced construction time by 25%. Inside, a large glazed atrium floods the central core with natural light, complemented by a mix of suspended and metal framed ceilings. The project also included associated car parking and landscaping, creating a well rounded, sustainable workspace that sets a new benchmark for office development in the region.

  • Key Features
    • Design and Build Contract
    • Five storey Grade A office development
    • GIFA 6000m²
    • Piled foundations and structural steel frame
    • Composite concrete flooring
    • First project to use Dekton as part of rainscreen façade
    • Off-site integral granite faced GRC wall and window panel system developed
    • Innovative use of GRC wall reduced construction periods by 25%
    • Perimeter strip curtain walling to offices
    • Mixture of suspended and MF ceilings
    • Large planer glazed atrium to central core
    • Delivery of associated car parking and landscaping

Project Design

  • Architect

    GM Design

  • M&E

    Delap and Waller

  • C&S

    Tetra Tech