Heron Bros’ Head Office 

Heron Bros
Client

Heron Bros Ltd


Heron Bros
Location

Draperstown, Northern Ireland


Heron Bros
Duration

36 Months


Heron Bros
Completion

Phase 1: June 2021, Phase 2: June 2023


Heron Bros
Value

£4m


Heron Bros
Client

Heron Bros Ltd


Heron Bros
Location

Draperstown, Northern Ireland


Heron Bros
Duration

36 Months


Heron Bros
Completion

Phase 1: June 2021, Phase 2: June 2023


Heron Bros
Value

£4m


Established in 1956 in Draperstown, Northern Ireland, we proudly chose this historic town as the site for our new state of the art headquarters. Having evolved into an award winning construction and property development company operating across the UK, Ireland, and Europe with over 250 staff, our new headquarters were designed to accommodate the planned and sustainable growth of the Heron Group.

Our Head Office redevelopment project centred around the sympathetic restoration of a listed building known as the ‘Corner House’, formerly a longstanding public house fronting onto Draperstown’s historic main street. This restoration formed the heart of our comprehensive Design and Build scheme that seamlessly integrated heritage preservation with modern workplace requirements.

Key construction elements included major tunnelling works to connect the historic building with new construction, creating a cohesive 31,000sqm office accommodation. The project exemplified our commitment to sustainability through energy efficient, super insulated construction, aligned with our ESG strategy and implementation of Circular Construction Principles.

The design prioritised collaborative working with open plan office areas, breakout spaces, and meeting rooms featuring fully interactive touch screens. Additional amenities include a staff café, landscaped gardens, and a bespoke modern gym facility developed in response to employee feedback, demonstrating our commitment to staff wellbeing.

Phase two involved refurbishing and fitting out our original offices to match the new headquarters’ finishes, with major tunnelling facilitating seamless connection between buildings.

  • Key Features
    • 31,000m2 modern office headquarters
    • Sympathetic restoration of listed ‘Corner House’ building
    • Design and Build delivery
    • BIM Level 2
    • Major tunnelling works connecting historic and new buildings
    • Energy efficient construction with super insulation supporting ESG strategy
    • Circular Construction Principles implementation
    • Sustainable systems including LED lighting with PIR sensors and biomass heating
    • Natural light maximisation with glazing optimising solar gains
    • Staff wellness facilities including fully equipped gym with changing rooms
    • 11 EV charging points supporting fleet electrification
    • Bespoke joinery including replica wooden sash windows with secondary glazing
    • Advanced M&E systems
    • Flexible workspace solutions with movable partitions and sit/stand desks
    • Full AV installation including ceiling speakers and microphones
    • Acoustic treatments controlling noise transfer in open plan areas
    • Landscaped gardens and outdoor spaces

Project Design

  • Architect

    McGurk Architects

  • M&E

    JCP Consulting

  • C&S

    Albert Fry Associates

Request a Capability Document

For more information please complete the form below and a member of our team will be in touch.

Request a Capability Document
Form Validation