Daisy Lodge Development

Heron Bros
Client

Cancer Fund for Children


Heron Bros
Location

Newcastle, County Down


Heron Bros
Duration

12 months


Heron Bros
Completion

February 2014


Heron Bros
Value

£3 million


Heron Bros
Client

Cancer Fund for Children


Heron Bros
Location

Newcastle, County Down


Heron Bros
Duration

12 months


Heron Bros
Completion

February 2014


Heron Bros
Value

£3 million


Creating Europe’s first therapeutic respite centre for families affected by cancer demanded exceptional sensitivity not only to the environment but also to the profound emotional needs of vulnerable families. Situated in one of Northern Ireland’s most scenic locations, the project called for a design and construction approach that harmonized with the stunning Shimna Valley landscape while providing a supportive sanctuary for those facing cancer.

Nestled just outside Newcastle in the breathtaking Shimna Valley, Daisy Lodge stands as a remarkable example of collaborative, purpose-driven construction. Since its completion in February 2014, this pioneering 16,000 sq ft facility has welcomed over 2,500 children and 9,000 family members, offering vital respite care within a nurturing, non-clinical setting. The centre’s creation marked a milestone as the first of its kind in Europe, designed to meet both the physical and emotional needs of families confronting cancer.

Heron Bros. delivered the mountain-style lodge two months ahead of schedule, achieving a seamless integration with the natural surroundings. The building’s design thoughtfully cuts into the hillside, presenting a single storey frontage that conceals a two storey complex behind. This innovative approach minimizes visual impact while maximizing the spectacular mountain views through extensive glazing and balcony features, creating a peaceful atmosphere that supports healing and reflection.

The lodge features six family suites, each with balconies overlooking the mountains, alongside a wellbeing suite that includes a gym and relaxation area. Additional amenities include a games room, playroom, two lounge areas, restaurant, and cinema facilities, all designed to foster comfort and community. Shared spaces such as a reception area, office, and learning space complement meeting rooms and a crèche with sensory facilities, all fully accessible to meet disabled and medical requirements.

  • Key Features
    • GIFA 16,000 sq ft
    • First therapeutic cancer respite centre of its kind in Europe
    • Multi-award winning environmental design
    • Over 11,500 beneficiaries since opening
    • Hillside integration with premium natural materials
    • Programme completed 2 months ahead of schedule
  • Awards
    • Awarded CEF inaugural ‘Building in Use’ Excellence Award 2019
    • Winner CEF ‘Social & Community’ Excellence Award 2015
    • Finalist RICS Award ‘Design through Innovation’ 2015
    • Winner National Green Apple Award for Sustainable Construction 2014

Project Design

  • Architect

    Michael McDowell Architects

  • M&E

    AH Design

  • C&S

    MCF Consulting

“It is the best project I have worked on in terms of the relationship with the CFC and the construction team. The input from the Charity’s board was invaluable and, in Heron Bros, I found a Contractor that was simply first class; I could not fault them. The whole ethos of the project was superb.”

Michael McDowell, Architect

Request a Capability Document

For more information please complete the form below and a member of our team will be in touch.

Request a Capability Document
Form Validation